View the photos of this utility scale solar project feeding power the Sacramento Municipal Utility District built by our founders.
The system was designed exclusively to send electricity to the SMUD grid, like a traditional power plant.
The solar panels were manufacturer in the U.S. by First Solar one of the very few manufacturers of CDTE solar panels in the world
Most of the construction was completed in 30 days which required a tigh management of the schedule with over 80 workers at the job site.
Approximatelly 1,000 kWp installed against the clock due to a utility deadline. This is a non penetrating ballasted solar system.
156kW non penetrating ballasted rooftop solar installation for this very active church and school.
A combination of a non penetrating ballasted rooftop solar installation and cement tile mounted solar.
This church solar system not only generates cheaper power than the utility but it provides shade.
Overlooking the water this modern church is harnessing the powe of the sun with a rooftop solar system.
To maximize the space available we installed a unique east west facing non penetrating ballasted system.
More than clean and cheaper power than the utility, shade to cars and pedestrians are the added benefits to this very busy church.
The ground mounted solar system provides the highest output given is perfect south orientation with an ideal tilt for the latitude.
A unique carport structure where panels face east and west. The design provides maximum height clearance.
Q&A with Scott Leggett, executive Pastor at Santa Cruz Bible Church. The projects utilized multiple roofs and attachment methods.
We maximize the of the school and church roofs to generate cleaner and cheaper power than the utility's.
Helping the church in the mega renovation project of the old Montgomery Wards property in downtown Bakersfield.
Site was created with Mobirise template